A fast-growing Tokyo space technology company moved into a new multi-floor headquarters with a satellite manufacturing cleanroom. Joining late in construction, mtc delivered IT infrastructure, AV and physical security on time, and has since been re-engaged to support the client’s expansion across five floors.
Client
Global space technology company
Industry
Aerospace and satellite technology
Location
Tokyo, Japan
Services
IT infrastructure, Structured cabling, AV integration, Physical security, Project management
Brought in late in construction, then trusted to support the client’s expansion across five floors.
5 floors
Supported through ongoing expansion
The brief
The client’s new headquarters combined engineering and administrative functions with a satellite manufacturing cleanroom, and its teams collaborated both locally and globally. mtc was brought in during the final stages of construction, with much of the interior fit-out already underway and a compressed schedule, yet was asked to design, coordinate and deliver a complete suite of workplace technology.
Challenges
- Joining midstream meant rapidly assessing IT and AV requirements and identifying gaps
- Systems had to be integrated without impacting the broader construction schedule
- Cleanroom IT requirements needed secure integration with general office systems
- Stakeholders in Japan, Singapore, the US and Europe worked mainly in English
- Construction and local implementation teams operated primarily in Japanese
What we did
IT infrastructure across multiple floors
Working closely with the client’s international IT team, mtc implemented a reliable and scalable network. The work covered server room design, structured cabling, hardware specification and rack deployment across multiple floors. Special care was taken to meet the cleanroom’s IT requirements, ensuring secure integration between general office systems and the satellite production environment.
AV for meetings and company events
To support hybrid collaboration, mtc installed video conferencing and content sharing in meeting rooms, and AV for an all-hands space used for company events and internal briefings. Controls were designed to be easy for non-technical users. All systems were standardised to the client’s global IT and AV framework, with customised layouts and bilingual user interfaces for daily operations in Japan.
Multi-layered physical security
mtc delivered access control for secure zones, CCTV coverage and integration with the building’s overall security plan. This required coordination between building management, general contractors and the client’s global compliance team to ensure regulatory alignment and operational safety across both general office and cleanroom zones.
Bilingual coordination and ongoing support
mtc acted as bilingual project coordinator, facilitating daily communication between the client’s global team and Japan-based trades, designers and vendors. After handover, mtc returned as new teams were onboarded and space was built out, providing system expansion, equipment upgrades and technical advisory services. It also supported lifecycle maintenance planning, including equipment documentation, firmware management and replacement planning.
Delivered in-house
Design, procurement, installation and handover were delivered by mtc’s in-house bilingual team, with one point of contact throughout.
Scope delivered
- Server room design
- Structured cabling and rack deployment
- Hardware specification
- Cleanroom IT integration
- Meeting room video conferencing
- All-hands event space AV
- Access control and CCTV
- Bilingual project coordination
Results
Despite tight time constraints, mtc delivered a fully operational workplace across multiple technology disciplines, and the original design has proven flexible enough to support the client’s continued growth.
- Secure, reliable IT network supporting engineering and business functions
- AV systems enabling global collaboration with intuitive, localised control
- Compliant, integrated security protecting general office and cleanroom zones
- Re-engaged multiple times to support expansion across five floors
- New installations kept technically and visually compatible with the original infrastructure
- Lifecycle planning helps reduce future disruption and supports compliance
Who does the work
Three things clients ask us about before anything else.
One bilingual team
Our in-house team works in English and Japanese, from design reviews with your global stakeholders to coordination with building management on site. One team carries your project from start to finish.
Licensed and compliant
mtc is a licensed telecommunications construction contractor (Kanagawa Governor Permit, General-6, No. 92487). We plan and deliver every project in line with Japanese regulatory requirements, building rules and landlord conditions.
Resident team, valid work status
Everyone working on your project, from project managers to engineers, is a resident of Japan with a valid work status. You always know exactly who is on site and that they are permitted to be there.
Services used on this project
More case studies

IT and AV Infrastructure for a European Biotech Office Expansion in Tokyo
New office floor for a European biotech company, handed over on time with no outstanding punch list items and meeting rooms in use from day one.

Simultaneous IT, AV, and Security Rollouts for a Global Professional Services Firm in Tokyo and Fukuoka
Tokyo expansion and new Fukuoka office for a global professional services firm, run in parallel over five months, on time, within budget and with zero punch items.