Simultaneous IT, AV, and Security Rollouts for a Global Professional Services Firm in Tokyo and Fukuoka

GlobalServices Office scaled

A global professional services firm needed to expand its Tokyo headquarters and open a new office in Fukuoka at the same time. mtc delivered cabling, AV, physical security and IT infrastructure for both sites in five months, on time, within budget and with zero punch items.

Client

Global professional services provider

Industry

Business process outsourcing and technology services

Location

Tokyo and Fukuoka, Japan

Services

Structured cabling, AV integration, Physical security, IT infrastructure, Project management

Two sites, five months, zero punch items at handover.

5 months

Design through to handover

2 offices

Delivered in parallel

400+

Seat capacity in Fukuoka

0

Punch items at handover

The brief

The client serves leading technology, financial and consumer brands with stringent IT, security and compliance requirements. To support growth in Japan, it needed an additional floor at its Tokyo headquarters and a new two-floor office in central Fukuoka, its first major regional location in Kyushu. Both projects ran simultaneously, with overlapping design, procurement and installation windows.

Challenges

  • A compressed five-month schedule covering two sites from design through to handover
  • Global IT, AV and security teams spread across multiple time zones
  • Older Tokyo AV systems that had not worked reliably for years
  • No reliable CAD drawings or digital floor plans for the Fukuoka building
  • Low dropped ceilings, shallow 50mm raised flooring and limited existing MEP infrastructure

What we did

Tokyo headquarters expansion

mtc fitted out an additional full floor in the existing building with more than 200 new workstations, 15 video conferencing rooms built to the client’s global AV standard, and a centralised office-wide paging system. Access control and CCTV were deployed in line with global IT and security policy. mtc worked with the appointed designer so all hardware and finishes met branding and quality standards, and matched existing infrastructure while upgrading it for better reliability.

Fukuoka office build-out

In central Fukuoka, mtc designed and installed structured cabling and network racks, 15 meeting rooms with video conferencing to the global AV standard, site-wide paging and announcement systems, card-based access control and IP CCTV for a 400+ seat office. With no reliable drawings, low ceilings and shallow raised floors, cable routes were carefully planned to avoid power conflicts and ceiling obstructions, and mtc coordinated with the MEP teams to secure cooling and power for the server room and AV equipment.

Parallel delivery and legacy AV recovery

To hold the five-month timeline, mtc accelerated design finalisation, secured global stakeholder approvals and prioritised procurement by lead time. As the Japan-based lead integrator, mtc provided clear documentation and bilingual communication, worked flexible hours across time zones and guided local vendors on international expectations. In Tokyo, mtc also assessed, troubleshot and updated the older meeting rooms, bringing them all back online while delivering the new floor to specification.

Delivered in-house

Design, procurement, installation and handover were delivered by mtc’s in-house bilingual team, with one point of contact throughout.

Scope delivered

  • Enterprise-grade CAT6 cabling and labelled documentation
  • Video conferencing to the global AV standard
  • Wireless access points validated by site survey
  • Card access control integrated with global platform
  • IP CCTV for entrances, common areas and IT spaces
  • Paging for announcements and emergency use
  • Procurement, staging, installation and programming
  • User acceptance testing

Gear list

  • Logitech Rally

    Video conferencing system installed in every meeting room across both offices

  • Biamp microphones and DSPs

    Audio capture and signal processing for the larger meeting rooms

  • Ekahau site surveys

    Used to plan and validate wireless access point placement

Results

Both offices were delivered on time for the client’s relocation schedule and were fully operational on day one. Staff needed minimal support thanks to intuitive interfaces and consistent system layouts across both sites.

  • Delivered on time, in line with the client’s relocation schedule
  • Within budget, with no unplanned scope additions
  • Zero punch items at handover across both projects
  • Tokyo gained extra capacity plus upgraded AV and supportable infrastructure
  • Fukuoka became a launchpad for business operations in southern Japan
  • mtc continues to support both sites with lifecycle maintenance and minor works

Who does the work

Three things clients ask us about before anything else.

One bilingual team

Our in-house team works in English and Japanese, from design reviews with your global stakeholders to coordination with building management on site. One team carries your project from start to finish.

Licensed and compliant

mtc is a licensed telecommunications construction contractor (Kanagawa Governor Permit, General-6, No. 92487). We plan and deliver every project in line with Japanese regulatory requirements, building rules and landlord conditions.

Resident team, valid work status

Everyone working on your project, from project managers to engineers, is a resident of Japan with a valid work status. You always know exactly who is on site and that they are permitted to be there.

More case studies

RideShare Office

Multi-year, nationwide IT and AV support for a ride-hailing and delivery platform, from headquarters to dark stores, on time and on budget.

Space Office

IT, AV and security, including a satellite cleanroom, brought in late in construction for a space technology company and since extended across five floors.