Helping You Achieve New Milestones

All-hands cafe space at Docusign Japan with a large LED display, cafe tables and planting

Congratulations to Docusign Japan on Their New Toranomon Hills Office

Congratulations to the team at Docusign Japan, who have moved into a new home on a larger floor at Toranomon Hills Mori Tower. The office opened in August 2026, built for a growing team in Japan and for technology that matches the standards Docusign runs across the rest of the business.

mtc is proud to have delivered every technology element of the move. We joined during the first test fits, around 14 months before the team walked in, and stayed through design, procurement, installation, commissioning and handover.

28

Meeting rooms, huddle spaces and event spaces

3 weeks

Start of works to full completion

1

Contract, team and point of contact

What mtc delivered

Everything, under one contract

Cabling, racks and IT

Panduit certified structured cabling, racks, UPS and PDU, wireless access points, IT installation and desk setup.

Meeting rooms

Zoom rooms across 10 video conferencing rooms and 15 huddle spaces, on Logitech hardware and Sony Bravia professional displays.

Training rooms

Two rooms that combine into one automatically, with multi-camera tracking that follows presenters and speakers.

All-hands cafe space

A 160 inch LED display and automated control that anyone can walk in and use, with no manual and no help needed.

Security

Access control, CCTV and visitor management on a cloud based platform.

Sound masking

A Biamp Cambridge system covering the whole floor, lifting the noise floor so conversations stay private in open areas.

Carrier and building coordination

Circuit delivery handled with the Japanese carriers directly, plus site access and building permissions.

The old office

Relocation of the IT equipment Docusign wanted to reuse, then decommissioning and handback to the building owner.

Read the full story

Docusign has been an mtc client for years, and projects like this one are the reason we do what we do. Thank you to the Docusign Japan team for the trust, and congratulations again on the new office. The case study covers the room technology, the gear list and how the site works were completed in three weeks.