A fast-growing Tokyo space technology company moved into a new multi-floor headquarters with a satellite manufacturing cleanroom. mtc delivered the IT infrastructure, AV and physical security for the new building.
Client
Global space technology company
Industry
Aerospace and satellite technology
Location
Tokyo, Japan
Services
IT infrastructure, Structured cabling, AV integration, Physical security, Project management
mtc joined during the final stages of construction, with much of the interior fit-out already underway.
On this page
The challenge
The technology had to fit a building already under construction
The new headquarters combined engineering and administrative functions with a satellite manufacturing cleanroom, and the teams there collaborated both locally and globally. mtc was asked to design, coordinate and deliver a complete suite of workplace technology on a compressed schedule.
Key challenges
- Assess IT and AV requirements quickly and identify the gaps
- Integrate systems without affecting the construction schedule
- Integrate cleanroom IT securely with general office systems
- Work in English with stakeholders in Japan, Singapore, the US and Europe
- Work in Japanese with the construction and local implementation teams
Our role
mtc delivered a fully operational workplace across multiple technology disciplines
Cleanroom requirements shaped the network design
Working closely with the international IT team at the client, mtc implemented a reliable, scalable network across multiple floors: server room design, structured cabling, hardware specification and rack deployment. Special care went into the cleanroom IT requirements, so general office systems and the satellite production environment integrate securely.
Meeting rooms and the all-hands space follow the global framework
mtc installed video conferencing and content sharing in meeting rooms, and AV for an all-hands space used for company events and internal briefings. Controls suit non-technical users. All systems follow the client global IT and AV framework, with customised layouts and bilingual interfaces for daily operations in Japan.
Security was coordinated with the building and the global compliance team
mtc delivered access control for secure zones, CCTV coverage and integration with the overall building security plan. That took coordination between building management, general contractors and the global compliance team at the client, for regulatory alignment and operational safety across both general office and cleanroom zones.
Bilingual coordination linked the global team and the Japan-based trades
mtc acted as bilingual project coordinator, facilitating daily communication between the global team at the client and Japan-based trades, designers and vendors. mtc also supported lifecycle maintenance planning, including equipment documentation, firmware management and replacement planning.
Scope
One in-house team from design to handover
Scope delivered
- Server room design
- Structured cabling and rack deployment
- Hardware specification
- Cleanroom IT integration
- Meeting room video conferencing
- All-hands event space AV
- Access control and CCTV
- Bilingual project coordination
Results
The original design carried the company across five floors
mtc returned as new teams were onboarded and space was built out, providing system expansion, equipment upgrades and technical advisory services.
A secure, reliable IT network supports engineering and business functions
AV systems give global teams intuitive, localised control
Compliant, integrated security covers general office and cleanroom zones
New installations stayed technically and visually compatible with the original infrastructure
Who does the work
Three things clients ask us about before anything else.
One bilingual team
Our in-house team works in English and Japanese, from design reviews with your global stakeholders to coordination with building management on site. One team carries your project from start to finish.
Licensed and compliant
mtc is a licensed telecommunications construction contractor (Kanagawa Governor Permit, General-6, No. 92487). We plan and deliver every project in line with Japanese regulatory requirements, building rules and landlord conditions.
Resident team, valid work status
Everyone working on your project, from project managers to engineers, is a resident of Japan with a valid work status. You always know exactly who is on site and that they are permitted to be there.
Services used
How we can help you
More case studies
Related projects

IT and AV Infrastructure for a European Biotech Office Expansion in Tokyo
New office floor for a European biotech company, handed over on time with no outstanding punch list items and meeting rooms in use from day one.

Simultaneous IT, AV, and Security Rollouts for a Global Professional Services Firm in Tokyo and Fukuoka
Tokyo expansion and new Fukuoka office for a global professional services firm, run in parallel over five months, on time, within budget and with zero punch items.
Tell us what you are planning
Talk to our bilingual engineers about scope, timing and budget. We will tell you what is realistic in your building.